German steelmaker thyssenkrupp Steel has opened a tender to select hydrogen suppliers for its direct reduction plant in Duisburg. The first deliveries are planned for 2031.
The initial procurement tranche is expected to cover around 20,000–40,000 metric tons of hydrogen a year. The final volume will depend on the bids received, including their commercial terms. Suppliers can register until December 17, 2026, after which the bidding phase will begin.
The plant will initially run on natural gas during its ramp-up, cutting carbon emissions by more than 50% compared with conventional blast furnace production. From 2031, hydrogen will gradually replace some of the natural gas, with a full transition planned for a later stage.
The direct reduction plant will have an annual capacity of 2.5 million metric tons of direct reduced iron. Its two smelters will have a combined capacity of 2.3 million metric tons of hot metal a year. The facility will be integrated into thyssenkrupp Steel’s existing Duisburg steelworks, allowing the company to retain its downstream processes and current range of steel grades. Once fully hydrogen-powered, the facility could cut annual carbon emissions by around 3.5 million metric tons compared with blast furnace production.
There are no comments yet.