China’s Hebei Jinxi Iron and Steel Group has commissioned the first of two continuous slab casters at its plant near Tangshan in Hebei Province. The first heat was cast after 13 months of work, two months ahead of schedule, UK-based equipment supplier Primetals Technologies said.
Each caster is designed to produce 2.5 million mt annually. Once the second unit starts operating, scheduled for spring 2027, their combined annual capacity will reach 5 million mt.
Ordered in 2025, the equipment is intended to expand production of high-quality electrical steel, particularly non-oriented grades used in new energy vehicles. The casters will also allow the company to produce silicon, peritectic and API special steel grades.
Both lines feature Level 1 and Level 2 automation, mold-level control and breakout prevention technologies. The systems are intended to improve product quality and operational safety while reducing downtime.
There are no comments yet.