• send
Rolled metal from warehouse and on order
AZOVPROMSTAL
We offer the best steel prices
+38 (098) 875-40-48
Азовпромсталь
  • Sheet steel in Mariupol, Dnipro and Kiev

    There are more than 2000 tons of sheet products in the company's warehouse. Various grades of steel, including st45, 65G, 10HSND, 09G2S, 40X, 30HGSA and foreign analogues S690QL, S355, A514, etc.
  • Steel rental on

    In the shortest possible time, we will produce any quantity of sheet steel of specified dimensions

The benefits of the availability of data on weather conditions in Mariupol are obvious

Польза от доступности данных по метеоусловиям в Мариуполе очевидна
NMU - adverse meteorological conditions. This abbreviation is well known to the Mariupol residents. It is in these conditions that we most often wake up in the morning.

Finally, on the website of the city council of Mariupol, forecasts regarding the occurrence and duration of the conditions under which a normal person simply suffocates was published. And it is very pleasant that someone from Metinvest is interested in such information. We read the message of the press service of PJSC MK Azovstal:

"Passing the order of the mayor No. 58p of 01/31/2012" On the development of additional measures and the work of industrial enterprises with adverse weather conditions "at the Azovstal Metallogic Combine, the Metinvest group, the implementation of measures aimed at reducing the technogenic impact on the Environment of Mariupol during the NMU.

During the reporting period, the work of technological units was dispersed in time with their stop at planning and preventive repairs.

In order to reduce the load on the environment in the domain workshop, the spilling machine No. 6 is displayed into the reserve. During this period, the rotating stove No. 1 was stopped for major repairs in the IOC; In the converter workshop, Mnlz No. 3 and 4 were stopped for repair. In the foundry, the thermal furnaces No. 7, 8, 9, in the carriageable workshop, were brought into the reserve, planning and preliminary repairs of the cargo loader No. 2 were carried out. In the coke workshop, the graphs of the issuance and loading of furnaces were shifted by an average of 2 hours, so that out of six coke batteries, issuing and loading were made on four batteries. On two batteries, the issuance was periodically stopped to carry out current repairs.

The control of the specialists of the units and the environmental service of the plant in the domain, converter, lime, lime, coke, carbon-training workshops, in agglomeration workshops, sero treatment, and trapping for accurate compliance with the technological regulations of production, are limited to loading and unloading work related to dust and gas production. The uninterrupted operation of all dust -preparations and their individual elements is ensured. It is prohibited by purging and cleaning of equipment and gas traders, as well as loading and unloading work associated with significant ardor.

As a result of the actions taken from April 28 to May 3, a decrease in emissions amounted to about 290 tons. ”

At least some Metinvest company reaction to our NMU (unfavorable meteorological conditions) cannot but rejoice.




a car tire warehouse in Kyiv will offer you the lowest price.


Азовпромсталь