CJSC Izhorsky Pipe Plant put into operation a modern complex of treatment facilities. The plant is located in Kolpino. The new treatment complex will significantly reduce the negative impact on the environment.
After cleaning, the water will contain a minimum amount of oil products. This makes it possible to use water repeatedly in technological cycles. Such water is used for the preparation of water emulsions, suspensions, mixtures, solutions that are used in production.
The launch of the new treatment equipment will save water up to 100 cubic meters per day.
CJSC Izhorsky Pipe Plant produces products for Gazprom OJSC, AK Transneft OJSC also for the Eastern Siberia - Pacific Ocean pipeline.
Izhora pipe protects water resources
![]() |
Azovpromstal® 19 September 2012 г. 00:01 |