• send
Rolled metal from warehouse and on order
AZOVPROMSTAL
We offer the best steel prices
+38 (098) 875-40-48
Азовпромсталь
  • Sheet steel in Mariupol, Dnipro and Kiev

    There are more than 2000 tons of sheet products in the company's warehouse. Various grades of steel, including st45, 65G, 10HSND, 09G2S, 40X, 30HGSA and foreign analogues S690QL, S355, A514, etc.
  • Steel rental on

    In the shortest possible time, we will produce any quantity of sheet steel of specified dimensions

Rational use of the roof of the building

Рациональное использование крыши здания

In any city there are many unused areas where you can and should install alternative sources of electricity. Wind farms can have a wide variety of technical requirements and installation restrictions. KB Energy solar stations can be mounted on almost any roof. Including on the roofs of multi-storey buildings, industrial facilities and private buildings.

Rational decision

In fact, roof area is not used rationally. Separate antennas, ventilation and industrial air conditioners are not taken into account. Since only a small free area is taken. Placing solar panels capable of capturing light and converting it into electrical energy is a rational solution. It will solve the following problems:

  1. The station operates without the intervention of residents, it generates stable income.
  2. The optimal arrangement of panels, which receives the maximum amount of light.
  3. Maximum rational use of the roof, without harming it.
  4. For

Important: The only limitation is that a solar power plant cannot have a peak output of more than 30 kW. Only in this case it will be possible to connect it to household power grids according to the “green tariff” principle.

Conditions for connection

It is impossible to independently use the roof area of ​​a high-rise building, even if it is empty. Difficulties can arise both in the case of industrial buildings and multi-apartment buildings. The main list of documentation to be provided includes:

  • geodetic building plan;
  • title deed;
  • roof lease signed by OSBB and the future owner of the solar station;
  • copies of OSBB registration documents
  • evidence confirming that the electrical cables will withstand additional stress.

The last point will be the most difficult from a technical point of view. In some cases, you cannot do without cardinal alterations or a bypass cable. If all the documents are collected, technical issues are resolved, the installation of the power plant takes place quickly enough. The final stage will be the installation of the inverter and the commissioning of the power plant on the roof of the building. It will begin to be beneficial almost immediately, reducing the cost of electricity consumed for each apartment owner.



Азовпромсталь