Like all capital construction projects, the railway needs periodic maintenance and repair. If in the case of highways it can be a question of removing holes that appear on the asphalt surface, then in the case of a railway it is, first of all, about the alignment of the rise of the track. Both of these important operations must be performed within the tight deadlines provided for by the regulations, since these operations interfere with the passage of vehicles on the highway.
Periodic alignment of the path in plan can be performed manually, with with the help of a hand-held track tool, and by the forces of mechanized teams, which use a variety of track machines to perform the assigned tasks. The choice of the means of implementing the assigned tasks depends on the equipment of the individual brigade and financial support. Naturally, it is faster to straighten the track in terms of using specialized track machines, which can effectively replace the work of several people and increase the overall productivity of the entire brigade. Since straightening or straightening is just one of the stages of a full-fledged railway repair, as a rule, it is preceded by serious preparatory work in several stages.
The safety of railway traffic depends on a well-executed straightening, since the deviation of the trajectory can lead to the derailment of transport from the road. Before performing the operation of straightening the track in the plan, the workers carefully study the current state of the road section using a special measuring trolley or carriage. As a result, workers receive an accurate diagram of the trajectory change, indicating all areas to be straightened. After that, preliminary preparation of the site is carried out, as a result of which it is necessary to adjust the joint gaps.
Performing straightening operations is greatly facilitated by lift-and-straighten track repair machine Russian production ... With the help of the PRM, it is possible to straighten the track at an average speed of 400 meters per hour, which indicates a high productivity of one machine. Since the equipment has a full-fledged and comfortable cabin, it is possible to transport service personnel and tools in it. As an option, the track-lifting and straightening machine can be equipped with a trailed trolley that can accommodate building materials.
The low weight and size of the machine makes it possible to quickly move equipment from the railway to the roadside for the passage of trains. This tactic will allow you not to completely block traffic in very busy areas.
Periodic maintenance of the railway track
|
|
Azovpromstal® 11 July 2016 г. 22:43 |
Subscribe to news
Metallurgy news
- 07 November 2025
21:00 Metalllus reports net sales growth in the third quarter 20:00 Car production in Argentina decreased year-on-year in October 18:00 In October 2025, retail car sales in India increased by 41% 18:00 Steel imports to Vietnam increased by 33.5 percent in October 2025 compared to September 17:00 The value of imports of steel products into France fell by 11.9 percent in January-August 2025 16:00 McCloskey: Steel importers in the EU face uncertainty over CBAM benchmarks ahead of the implementation of the 2026 plan 16:00 CPA: Section 232 steel tariffs remain critical to U. S. National Security and Industrial sustainability
15:00 Japanese JFE Steel reported a decrease in net profit for the first half of 2025
Publications
06.11 Industrial floors from the company Meridian 03.11 Professional video surveillance for stores 31.10 Professional IT services 30.10 Equire Safe Storage Warehouse 29.10 Air conditioner refilling services from Climat Center