Expansion and growth of capacity
The delivery volume provided by SMS Group included two 300-ton converters with primary dry gas treatment plants and secondary metallurgy plants, including a 300-ton double-bucket furnace and two 300-ton duplex Ruhrstahl Heraeus plants. With advanced recovery systems and ultra-low emissions, the new facilities strengthen Hoa Phat's commitment to green steel production, achieving less than 20 mg/Nm3 dust emissions.
The full order was divided into two delivery groups, and both groups 1 and 2 were installed and put into operation ahead of schedule, the first in September 2024, and the second in August this year.