The Ashinsky Metallurgical Plant plans a comprehensive reconstruction of leaf -rolling production and the construction of a new workshop. To fulfill the intended goals, the Czech Export Bank will provide the plant with a loan of 301 million euros for a period of 13 years. The received funds will also be aimed at the technical re -equipment of the current production.
Construction and reconstruction is carried out by Alta Rus. At this stage, the construction site is completely ready for further work and the foundation of the future building is laid. At the same time, columns and crane beams are installed. In the current leaf -rolling workshop, the tunnel is being prepared for the installation of communications, new railway tracks are laid and a new dining room is being built.
The new leaflet workshop is planned to be commissioned in 2014. A comprehensive reconstruction of the production of sheet rental at the Ashinsky Metallurgical Plant should ensure an increase in the variety of products and improve its quality, which will strengthen the position of the enterprise in the metal product market.
Nashorn, founded in 2004, is today one of the largest manufacturers of plastic drainage pipes. Plastic drainage pipes and drainage pipes in geotextiles made at the enterprise are intended primarily to drain the upper layers of the soil. This is an absolutely necessary condition for the construction of a strong, complies with the requirements of SNiP of the foundation. The organization of drainage using plastic pipes can significantly reduce the time and material costs in the production of construction work.
Ashinsky Metallurgical Plant will build a leaflet workshop
![]() |
Azovpromstal® 9 November 2012 г. 00:01 |