As part of the agreement, Voestalpine supplied about 290 kilometers of 120-meter rails produced at the rolling mill in Donawitz. The rails, designed for speeds up to 250 km/h, provide improved track performance, longer service life and lower maintenance costs.
High-tech switches and digital systems
The project also includes 235 switches manufactured at Voestalpine Railway Systems' Zeltweg plant with digital monitoring technology produced by Weichenwerk Wörth in collaboration with the Austrian Federal Government. Railways.
Monitoring systems continuously monitor the state of the infrastructure, maintain high security standards, and provide predictable maintenance based on the condition.




