The world-famous enterprise, the leader in the production of aluminum, OK Rusal acquired the BTEC (theological TPP), which previously belonged to CES Holding. This expensive acquisition will enable the enterprise to establish a stable production of clay on the basis (Theological Aluminum Plant), which is located in Krasnoturinsk.
Thanks to the purchase of the Rusal station, I got the opportunity to significantly reduce costs in the release of clay and at the same time increase product quality. It is important that, at the same time, the production of clay in Krasnoturilsk will completely save all jobs.
The installed generated capacity on theological TEC is at the level of 135.5 MW, which more than satisfies the needs of production. The station will be part of the rosal clay sector and will become one of the components of the entire production complex.
“Buying an BTEC is a great opportunity to significantly increase energy efficiency and reduce production costs at the base. The formation of TEC of one of the parts in a unified complex of production creates new prospects in the development of the largest enterprise in the Russian Federation for the production of alumina, - it is such a view of the deal that Vladislav Solovyov, the First Deputy General Director of Rusal, has.
“The sale of an BTEC is a really successful result of negotiations between companies. This station will be able to provide all the needs of the base in electricity for a long time. The sale of theological TPP is the best solution that takes into account both the interests of Rusal and the holding CAS, ”said Boris Weinzyer, CEO of CJSC CJSC.
Subscribe to news

Metallurgy news
- Today
13:00 The decline indicator in the construction industry: A500C reinforcement, a key element of reinforced concrete structures, sharply loses in price 13:00 Implats will close its Lac des Iles palladium mine in Canada by mid-2026, according to a company representative, this decision was conditioned by 11:00 They said: "Let's go!" 11:00 Generative artificial intelligence 10:00 Seligdar, Analytics in the Company Main Metrics 10:00 They said: "Let's go!" - 17 July 2025
15:00 MMK Operating results 2kv \ '25 13:00 Dry beam put into operation a new ore unit with iron content 58.5%
Publications
17.07 SVITSHOTY DETYACHI: GID on VIBOR TH VIE 14.07 Almaty crossings 09.07 Internet provider Kazakhtelecom: Services for the population 09.07 Reliable decisions in the field of thermal insulation 03.07