It is planned to start gold production on an industrial scale in 2014. And now, so far only construction work is underway on the mine. The leadership of the Kamchatka gold reported that the first steps to the intended target have already been made: "The construction process is already in full swing. Stefing is already being carried out and ceiling is created. This will make it possible to avoid loss of ore, and also ensure maximum safety for working personnel." Also, the leadership of the company, the executive director of which is Alexei Shakhmatov, is reported that construction work is carried out in the most difficult geological conditions, because gold lies in quartz veins with their vertical location. Based on this, when driving, the collapse of the rock can be observed, which the workers are trying in every possible way. "

According to official figures, 81 people are employed in the construction of the mine, but next year, as Alexei Shakhmatov says, 156 people are planned to be attracted. And when the industrial mining of ore will grow to 85 thousand tons per year, then 220 people will be involved at the same time.
Judging by the number of miners, the deposit is not very large, but the amount of gold in the ore favorably distinguishes it against the background of everyone else. In addition to the gold and amethyst mines, it is planned to begin the development of deposits such as Kumroch, Vetrova, Maletai and Baranievskoye.