Rolled metal from stock and to order
AZOVPROMSTAL
We offer competitive steel prices
+38 (097) 475-20-95
  • Sheet steel in Mariupol, Dnipro and Kiev
    There are more than 2000 tons of sheet products in the company's warehouse. Various grades of steel, including st45, 65G, 10HSND, 09G2S, 40X, 30HGSA and foreign analogues S690QL, S355, A514, etc.
  • Steel rental on order
    In the shortest possible time, we will produce any quantity of sheet steel of specified dimensions
+38 (097) 475-20-95

Metallurgy news

  • The Ukrainian Frunze Plant takes part in the preparation of the 2014 olympic Games
    The Frunze Plant already has its own history of work with the largest sports complexes of not only Russia, but also Ukraine. The company supplied the perforated sheet for cladding buildings, modern fencing sections and other products for equipment for sports facilities during preparation for Euro…
  • Metinvest will withdraw backwards from stagnation
    Mining and Metallurgical Group Metinvest, as a result of the implementation of an option for a ransom of 50% in the mining and metallurgical business of the industrial group, was acquired by 50% of the shares of the Zaporizhstal plant. In July 2011, the industrial group provided Metinvest with an…
  • Logistic expenses in the Vaninsky Sea Port will be increased by 12.5%
    The Federal Service for the Russian Federation in tariffs plans to significantly increase the cost of handling goods in the Far East in the seaport of the port of Vanino, reports the company "Logistics Service" http://servis-logistica.ru/. The increase in the logistics component in the price of…
  • Steel -industrial company - Krasnoyarsk put into operation a new leafgog
    For the production of pre -elements of the roof and facade, the steel -industrial company - Krasnoyarsk launched in July 2012 in industrial operation modern equipment - new leafgia . listoga is used to obtain a given configuration from a thin -leaf metal of the profile. It perfectly provides the…
  • Novolipetsk Metallurgical Plant put into operation a Russian domain oven Russian
    The domain furnace "Russian", the capacity of which is 3.4 million tons of cast iron per year, was launched into production by the Novolipetsky Metallurgical Combine at full capacity. This project was carried out in cooperation with the Luxembourg company Paul Wurth. In addition, about 70…
  • Severstal entrusted the supply of leaf shoes for the flagship of the Russian submarine fleet
    On July 30, 2012, a solemn ceremony of laying the submarine - the atomic underwater cruiser Prince Vladimir, took place on Sevmash (OJSC "on Sevmash"). Sheet steel for the construction of the ship is supplied by the Cherepovets metallurgical plant - Severstal. To date, to ensure the construction of…
  • Cherepovets Metallurgical Plant completed the converter repair project
    The project for the overhaul of converter No. 3 at the Cherepovets Metallurgical Plant was carried out by the general contractor of the Severstal-PromService LLC. Also, repair work was carried out by such enterprises as SSM - Lyubomash, North -West Fireproof and Domnaremontremont. In general, 95…
  • At the Ilyich plant, a turbogenerator in the TPP will be repaired
    According to the maintenance schedule, once every four years, it is necessary to carry out regulatory repair work on the turbogenerator No. 2 of the ILICHI TPP-1 MMK. Currently, the turbogenerator has been stopped for repair work within one month. Overhaul costs will be approximately 1.5 million…
  • Ukrainian companies managed to increase the prices for sheet steel in the European Union market
    The Magnitogorsk Metallurgical Plant exhausted the annual quota for the supply of metal rolling and, in particular, leaf steel to Europe. The reduction in the supply of the Russian giant was used by Ukrainian metal traders who set the vacation prices for a hot -rolled roll produced by Zaporizhstal…
  • The Ilyich Plant will put into operation the installation of dusty fuel blowing until August 10, 2012
    The installation of dust -angle blowing of the fuel into the design of the domain furnace allows you to reduce the codes and completely abandon the use of natural gas in dominant production. The commissioning of a new installation will also ensure a significant decrease in emissions of pollutants…
Pages   ← previous     next →