Rolled metal from stock and to order
AZOVPROMSTAL
We offer competitive steel prices
+38 (097) 475-20-95
  • Sheet steel in Mariupol, Dnipro and Kiev
    There are more than 2000 tons of sheet products in the company's warehouse. Various grades of steel, including st45, 65G, 10HSND, 09G2S, 40X, 30HGSA and foreign analogues S690QL, S355, A514, etc.
  • Steel rental on order
    In the shortest possible time, we will produce any quantity of sheet steel of specified dimensions
+38 (097) 475-20-95

Metallurgy news

  • Debts on the salary of the workers of the Verkhnesyachikhinsky Metallurgical Plant are repaid
    The Verkhnesyanyachikhinsky Metallurgical Plant, located in the Sverdlovsk Region, is declared bankrupt. The owners of the enterprise Cyprus offshore companies "Catching Trading limited" and "Volga SAR" withdrew the profit from the sale of products on the remains of the warehouse. As a result…
  • Rosatom creates a superconducting industry
    The State Corporation "Rosatom" is working on the implementation of the project "Innovative energy/superconducting industry". The completion of the project is scheduled for 2015. By this time, according to the representative of the corporation, prototypes based on new technologies will be…
  • Izhora pipe protects water resources
    CJSC Izhorsky Pipe Plant put into operation a modern complex of treatment facilities. The plant is located in Kolpino. The new treatment complex will significantly reduce the negative impact on the environment. After cleaning, the water will contain a minimum amount of oil products. This makes it…
  • Preferences data from Ukrainian electrometallurgical plants may be canceled
    On September 18, a meeting was held on the development of domestic electrometallurgical enterprises, chaired by Prime Minister of Ukraine Nikolai Azarov. “Today we are gathered to discuss key issues of the development of electrometallurgical enterprises,” the Prime Minister began with such words…
  • The strike in South Africa is discontinued
    The strike of miners on the platinum mines of South Africa, owned by the British company Lonmin, ended. Since August this year, the miners stopped work on one of Marikana's largest mines. During the skirmishes with the police, about 100 people were injured, and 44 miners died. After five weeks…
  • The Seversky Pipe Plant prepared for the construction of a continuous pipe rolling mill
    Capital repairs are completed at the Seversky Pipe Plant. During the repair process, several problems were solved. In the pipeline workshop, not only the equipment was completely restored, but a platform for the construction of a new continuous pipe rolling camp was built. As part of the overhaul…
  • German metallurgists reduced the production of steel to the January minimum
    The volumes of steel in Germany in August of the month of this year were reduced by 7%, compared with the same period in 2011, and reached 3.4 million tons. And compared with July 2012, these indicators decreased by 5%. The German steel federation connects this drop in production with a planned…
  • The production of metallurgical products in Azerbaijan has increased
    According to statistics, in Azerbaijan over the past eight months of 2012, the production of products of the metallurgical industry increased by 78% in annual calculus. During the reporting period, the publication of cast iron increased by more than 3 times, compared with the corresponding period…
  • Turboate carried out reconstruction of equipment
    Completed work on modernization and repair in the steam turbine Workshop OJSC Turboatom. Starting in 2010, preparations began for a stop and dismantling the Waldrich Coburg portal and milling machine. In 2011, the main nodes of the machine were reconstructed in Germany. Elements of the hydraulic…
  • At the Ilyich plant, the camp 3000 was repaired
    Recently, at the Ilyich Metallurgical Plant, which is part of the Metinvest group, 3,000 leaf -rolling camp was successfully repaired. About the end of the overhaul was reported by the head of the camp 3000 Valery Pushkov. “The planned repair work was carried out in the planned time and in full…
Pages   ← previous     next →